Engineered truss system — truss manufacturer PS1 required
Multi-unit construction
Two or more household units — triggers C1 fire separation requirements
Fall risk greater than 1.0m
Any edge where fall height exceeds 1.0m — activates F4 and F7 barrier requirements
Solid fuel appliance
Woodburner or fireplace — triggers flue and hearth specification requirements
All fields except address are optional
Dunedin City Council
DCC
Climate Zone 3 · Dataset: 6 case studies
Whakatane District Council
WDC
Climate Zone 2 · OIA pending
Selwyn District Council
SDC
Climate Zone 4 · 100,152 RFI instances
Ashburton District Council
ADC
Climate Zone 5 · BAM-002-R checklist
Central Otago DC
CODC
Climate Zone 6 · NZSIP expertise
Buller District Council
Buller DC
Zone 4–5 · Very High wind
Other / Not listed
GENERIC
Generic National NZBC patterns only
Site & environmental zones
Auto-set from council · override if needed
Client & designer (optional)
Project summary — confirm before starting
What happens next
ConsentIQ will open your gap tracker pre-configured for . Your scope flags are already set — work through the checklist or upload drawings to run the AI analysis.
Delete project?
This will permanently delete this project and all its saved items. This cannot be undone.